The most important determinant of the installed cost of a BTM BESS is the overall scale of the system. By “scale”, I refer to the joint magnitude of the energy and power capacity, abstracted away from variation in discharge duration.
Thus, my preferred specification for predicting the installed cost of BTM BESS is as follows: (5) ln ( C i) = α t s + β 1 ln ( E i) + β 2 ln ( P i) + γ 1 ln ( E i) 2 + γ 2 ln ( P i) 2 + γ 3 ln ( E i) ln ( P i) + δ 1 A C i + δ 2 D C i + δ 3 ln ( w t c) + ɛ i
Visual inspection suggests that the Cobb–Douglas model underestimates the cost (i.e., generates a prediction with a positive residual) of BTM BESS with discharge durations less than one hour and more than three. Between one and three hours, the distribution of residuals is nearly identical and centered on zero.
Furthermore, TTS includes project-level data on 68,061 BTM BESS co-installed with solar PV. The preponderance of these observations (91.4%) are in California. Because the TTS dataset does not disaggregate BESS and PV costs, the upfront cost of BTM BESS present only in the TTS dataset cannot be modeled disjointly from the upfront cost of BTM PV.
The increase in energy consumption, driven by rapid electrification, data consumption and AI, coupled with Australia's supportive regulatory policies and record low renewable energy capital expenditures (capex) costs, have fuelled a competitive environment for quality BESS projects.
The largest BESS project reaching financial commitment for the quarter was in Wooreen, Victoria, with a storage capacity/ energy output of 350 MW/ 1.4 GWh, and duration of four hours, while South Australia had the largest share of financially committed storage projects in capacity (640 MW / 1.8 GWh).
The remaining BESS that secured financial commitment in the first quarter of 2025 include Copenhagen Infrastructure Partners' 240MW/960MWh Summerfield BESS, Intera Renewables' 250MW/500MWh Limestone Coast North Energy Park, and Amp Energy's 150MW/300MWh Bungama BESS (stage one), all located in South Australia.
The 2022 Integrated System Plan, released by the Australian Energy Market Operator (AEMO), highlights that the forecasted withdrawal of approximately “8 gigawatts (GW) of the current 23 GW of coal-fired generation capacity by 2030” will introduce complexities within the National Electricity Market (NEM).
The Energy Storage Europe Association Guidelines on Safety Best Practices for Battery Energy Storage Systems (BESS) are designed to support the safe deployment of outdoor, utility-scale lithium-ion (Li-ion) BESS across Europe.
Consideration should be given to keeping BESS separate from combustible construction and storage, and away from living spaces (bedrooms, living rooms). Garages (with good separation/protection from vehicles) or similar unoccupied utility spaces with suitable fire-separation are the best choice for indoor residential BESS installations.
In early 2024, the price of residential BESS offered to end consumers in Europe ranged widely, from €400 to more than €1,200 per kilowatt-hour (kWh) (Exhibit 2). Historically, European OEMs built trust-based brands by highlighting their “made in Europe” status and rode the first-mover wave over the past ten years.
Additionally, DK1 guideline suggests that managing explosion risk for larger BESS should involve placing them outdoors. Organizations applying for permissions to install BESS are tasked with evaluating explosion risks and determining whether ventilation or other measures are necessary.
Get technical specifications, product datasheets, ROI analysis templates, and 2026 energy storage subsidy policy information.
2530 Energy Park Drive, Midrand
Johannesburg 1685, South Africa
+27 11 874 5200
Monday - Saturday: 7:00 AM - 6:00 PM SAST